U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

All Reports

Federal Sustainability Report and Implementation Plan

Report Number
2021-15783

The Office of the Inspector General included an audit of TVA’s Federal Sustainability Report and Implementation Plan (SRIP) in its FY 2021 Audit Plan, based on the reputational risk of disseminating inaccurate information to the public. The objective of the audit was to determine if information in TVA’s SRIP has been validated prior to being disseminated to the public in accordance with any best practices. We found TVA did not perform procedures to validate data used to calculate nine of the ten metrics reported in the FY 2020 SRIP.

Audit

Organizational Effectiveness – Generation Services, Field Services

Report Number
2021-15800

The Office of the Inspector General conducted a review of the Generation Services, Field Services organization to identify factors that could impact Field Services' organizational effectiveness. During the course of our evaluation, we identified many positive behaviors for engagement; however, we also identified needed improvements in behaviors in relation to first-line supervisors in three departments.

Inspection / Evaluation

Transmission and Power Supply Arc Flash Protection

Report Number
2020-15768

The Office of the Inspector General determined some requirements of the Tennessee Valley Authority’s procedures related to arc flash protection and engineering calculations were not performed. Specifically, (1) some arc flash hazard analyses were not performed, (2) arc flash hazard analyses were not periodically reviewed, (3) some arc flash hazard analyses were incomplete or inaccurate, and (4) some hazards were not accurately communicated on warning labels as required. In addition, we found arc flash hazard calculations were not formatted, approved, or maintained as required.

Inspection / Evaluation

The L.E. Myers Co. - Contract No. 9070

Report Number
2020-15713

As part of our annual audit plan, we audited costs billed to the Tennessee Valley Authority (TVA) by The L.E. Myers Co. (LE Myers) under Contract No. 9070 for construction and modification services for TVA's Transmission and Power Supply Program. The contract provided for TVA to compensate LE Myers for these services on either a cost-reimbursable or fixed price basis. Our audit objective was to determine if costs were billed in accordance with the terms and conditions of Contract No. 9070.

Audit

Coal Plant Industrial Hygiene

Report Number
2020-15754

The Office of the Inspector General found the Tennessee Valley Authority’s (TVA) industrial hygiene planning and assessment process had weaknesses that resulted in some hazards not being identified and evaluated.

Inspection / Evaluation

Strategic Real Estate Plan

Report Number
2020-15750

Due to an increase in transactions regarding real estate, we performed an evaluation to assess the Tennessee Valley Authority’s (TVA) development and implementation of its strategic real estate plan. However, TVA does not formally have a strategic real estate plan; therefore, we reviewed the goals and objectives of the Strategic Real Estate and Governance (SREG) organization to determine if they were being achieved.We determined SREG has met, or was in the process of meeting, their stated goals and objectives.

Inspection / Evaluation

Organizational Effectiveness-Sequoyah Nuclear Plant Chemistry/Environmental

Report Number
2020-15752

The Office of the Inspector General conducted a review of the Sequoyah Nuclear Plant Chemistry/Environmental (SQN Chemistry) organization to identify factors that could impact SQN Chemistry’s organizational effectiveness. During the course of our evaluation, we identified behaviors that had a positive impact on SQN Chemistry. These included relationships with most management. However, we also identified behavioral risks related to accountability, relationships within and outside Chemistry, low morale, and ethics.

Inspection / Evaluation

Organizational Effectiveness – John Sevier Combined Cycle Plant

Report Number
2021-15802

The Office of the Inspector General conducted a review of the John Sevier Combined Cycle (JSCC) Plant to identify factors that could impact JSCC’s organizational effectiveness. During the course of our evaluation, we identified behaviors that had a positive impact on JSCC. These included positive relationships between team members and management; however, we also identified minimal behavioral risks associated with communication and accountability. In addition, we identified minimal risks to operations that, if unaddressed, could hinder JSCC’s effectiveness.

Inspection / Evaluation

Transmission Switching and Clearance Procedures

Report Number
2020-15749

Due to the importance of switching and clearances being performed safely to avoid injuries and to minimize the possibility of unscheduled outages or equipment damage, we performed an evaluation to determine if switching and clearances, required training, and audits were performed in compliance with Transmission and Power Supply’s switching and clearance procedures. We determined the selected procedural requirements for requesting and tracking of switching and clearances were generally performed in accordance with procedures.

Inspection / Evaluation

Organizational Effectiveness – Commercial Energy Solutions Fuels and Hedging

Report Number
2020-15762-04

The Office of the Inspector General conducted a review of the Commercial Energy Solutions Fuels and Hedging (F&H) organization to identify factors that could impact F&H’s organizational effectiveness. During the course of our evaluation, we identified behaviors that had a positive impact on F&H. These included relationships with team members and most management. However, we also identified a behavioral risk related to relationships with a manager in one group. In addition, we identified risks to operations that could hinder F&H’s effectiveness.

Inspection / Evaluation