U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

All Reports

TVA's Prescription Safety Eyewear Program

Report Number
2006-511I

At the request of TVA Occupational Health and Workers' Compensation, we performed a limited scope review to assess whether policies, procedures, and key control activities ensure compliance with TVA's Prescription Safety Eyewear Program requirements. In summary, we determined TVA's policies and procedures adequately address the eligibility requirements and process to be followed in order to obtain prescription safety eyewear.

Audit

Gallatin Fossil Plant Coal Deliveries

Report Number
2006-524I

We compared Gallatin Fossil Plant (GAF) coal receipts using TVA and terminal shipment weights to identify whether any significant variances exist. Our review covered December 1, 2005, to May 3, 2006. We determined (1) coal receipt information input into FuelWorx (FWX) and the Daily Coal Report (DCR) were generally accurate and (2) significant variances exist between vendor/terminal invoiced weights and TVA delivered weights. Specifically:All but 1 of the 64 tested coal shipments were input into FWX and the DCR accurately.

Audit

Craft Labor Time Reporting (Browns Ferry Nuclear Plant Unit 1 Restart)

Report Number
2006-514I

At the request of TVA Nuclear (TVAN), we reviewed Stone and Webster Engineering Corporations' (SWEC) craft labor time reporting associated with the October 2005 Unit 1 Restart craft labor switch to five eight-hour straight-time work schedules. In 2005, TVA and the Tennessee Valley Trades and Labor Council modified their memorandum of understanding, including Attachment A, Mandatory ? Eight/Ten Straight-Time Attendance Agreement (LRS-54). The change was made to increase productivity (e.g., to curtail absenteeism and tardiness).

Audit

TVA's Role as a Regulator

Report Number
2005-522I

We conducted a review to assess the TVA role as rate regulator over municipal utilities and cooperatives (collectively "distributors") which purchase TVA power. The TVA Act imposes only one regulatory requirement, prohibiting discrimination between consumers of the same class. The TVA Act, however, also gives the Board authority to include terms and conditions in power contracts as needed to carry out the purposes of the Act, which include keeping rates as low as feasible.

Audit

Dental Claim Adjudication

Report Number
2006-516I

We performed a limited scope review to determine if claims are being adjudicated in accordance with the provisions of the TVA Dental Benefit Plan. While the majority of claims reviewed were adjudicated properly, we did identify an adjudication error associated with charges for preventive services. TVA Employee Benefits had also discovered the error and subsequently addressed the issue. The dental claim administrator had reimbursed TVA in the amount of $5,353.22 and reimbursement for 16 additional charges identified by our review was pending. Summary Only

Audit

Review of Employee Recognition Costs Billed by a Contractor

Report Number
2006-010C

We audited the employee recognition costs billed to TVA by a contractor under two contracts for engineering services provided in support of BFN Unit 1. In summary, we found the contractor had (1) not refunded TVA for $71,406 of unspent funds under one contract and (2) billed TVA $49,093 for employee recognition costs under the second contract. Although the second contract did not provide for TVA to receive a refund, the amounts paid by TVA had been agreed to based on the contractor's representations that it would be incurring employee recognition costs.

Audit

Welding Services for Fossil & Hydro Projects

Report Number
2005-004C-03

We audited $12.4 million of costs billed to TVA by a contractor for performing welding services for fossil and hydro projects. In summary, we found TVA had been overbilled $539,194 for (1) labor costs due to unsupported records and the contractor's use of incorrect labor rates; (2) mobilization, travel, and per diem costs that were ineligible or billed at incorrect rates; (3) duplicate costs and invoice calculation errors; (4) equipment costs due to the contractor's use of incorrect billing rates; and (5) unsupported costs.

Audit

Nuclear Security Services

Report Number
2006-005C-01

We reviewed $59.2 million of costs paid by TVA to a contractor for providing managed security services for TVA Nuclear and security support for other TVA organizations.

Audit

Tritium Production Services

Report Number
2006-001C-01

We reviewed $5.7 million of payments TVA made to a contractor for providing analysis and licensing support for tritium production at Sequoyah Nuclear Plant and determined the contractor had overbilled TVA $78,653. The overbilling included (1) an estimated $76,075 in unsupported labor costs and (2) $2,578 for travel and material costs that were either unsupported or ineligible. TVA management is planning to recover the overbilled costs. Summary Only

Audit

TVA Land Disposals

Report Number
2005-525I

We assessed TVA's compliance with applicable policies, procedures, and laws/regulations when conducting land disposal transactions. TVA's land disposal actions include easements, sales, abandonments, deed modifications, transfers, and leases. The TVA Act grants TVA authority to transfer land to government agencies, corporations, partnerships, or individuals. TVA's overall policy on the use, acquisition, and disposal of land is contained in TVA Code V, which was last updated in 1982. With regard to reservoir property:TVA maintains 293,000 acres of reservoir property.

Audit