Contract for air preheater equipment at TVA fossil plants
We audited the costs billed to TVA by a contractor for the design, engineer, and delivery of air preheater equipment for TVA fossil plants. Our audit, which covered $23.2 million TVA had paid the contractor, found TVA had been overbilled at least $2,232,780.The contract provided for all work, with the exception of a baseline project at Allen Fossil Plant, to be performed on a cost reimbursable basis.