U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

All Reports

Distributor Audit of Warren Rural Electric Cooperative Corporation

Report Number
2010-13286

The OIG audited Warren Rural Electric Cooperative Corporation's (WRECC) compliance with its power contract with TVA. WRECC is a power distributor based in Bowling Green, Kentucky. For fiscal year 2010, WRECC provided power to approximately 60,000 customers that resulted in revenues of approximately $157 million. WRECC also owns and/or operates nonelectric businesses including a security system and monitoring service division, a propane sales subsidiary, and a natural gas distribution subsidiary, and partially owns a nonelectric bill processing company.

Audit

Review of the Environmental Sampling and Monitoring Plans for the Kingston Ash Spill

Report Number
2008-12283-07

Marshall Miller & Associates, Inc. (Marshall Miller) was hired by the Office of Inspector General (OIG) to review the sampling and monitoring plans prepared by the Tennessee Valley Authority (TVA) for its Kingston Fossil Plant located in Harriman, Tennessee, following an ash release that occurred on December 22, 2008.

Audit

Peer Review of Johnsonville Fossil Plant Dike Stability Improvements

Report Number
2009-12910-05

TVA OIG retained Marshall Miller & Associates, Inc. (Marshall Miller) to conduct a peer review of the Stantec Consulting Services, Inc. (Stantec) documents for proposed improvements to the stability of the Northeast Dike of the Ash Disposal Area No. 2 of the Johnsonville Fossil Plant. Based on Marshall Miller's technical review, Stantec used generally accepted methods and practices to design the stability improvements.

Audit

TVA's Groundwater Monitoring at Coal Combustion Products Disposal Areas

Report Number
2009-12991

This review was initiated because of questions raised during congressional testimony following the Kingston Ash Spill in December 2008. The objectives of this review were to determine whether the Tennessee Valley Authority (TVA) has (1) performed groundwater monitoring as prescribed by the permits and (2) found levels of constituents monitored that exceeded regulatory limits and, if so, implemented any required corrective actions.During our review, we found that in some instances TVA was not performing monitoring as prescribed by the permits.

Audit

Review of Physical and Logical Access for Contractors

Report Number
2010-13132

The Office of the Inspector General reviewed the IT controls for granting and monitoring non-nuclear contractor access to TVA Assets, including general network access. The OIG found TVA's controls over processes for managing and tracking non-Nuclear contractor logical and physical access need to be strengthened to reduce the risk of loss or compromise of sensitive TVA data and physical assets.

Audit

Pressures On, Inc

Report Number
2010-13104

We audited $2.2 million in costs billed to TVA by Pressure's On, Inc. (POI), for providing vacuuming services at TVA's fossil and nuclear plants. Our objective was to determine if POI had billed TVA in accordance with the contract terms and conditions.

Audit

Performance of Agreed Upon Procedures for CRS Green-E Energy Program RY 2010

Report Number
2011-13891

We completed agreed-upon procedures to assist the Center for Resource Solutions in determining TVA's compliance with the annual reporting requirements of CRS' Green Pricing Accreditation Program for the year ended December 31, 2010. The results of the procedures applied were provided to the Center for Resource Solutions. Summary Only

Audit

Review of Supply Chain's Controls Over Contract Documents

Report Number
2010-13466

In 2007, TVA issued a procedure to ensure consistancy in the tracking and handling of contract documents and associated files across TVA. The procedure established a standard method to be used by all TVA organizations for the storage and retrieval of contract documentation in Contracts Central, TVA's repository for contract records.We conducted an audit of Supply Chain's centralized handling of contract documents to assess and determine compliance with the policy, We found Supply Chain was not in compliance with TVA' s policies regarding the use of Contracts Central.

Audit