All Reports

Review of NPG and CG&O Critical Spare Parts Programs

Report Number
2012-14587

The Tennessee Valley Authority (TVA) identified asset performance and operations as a major risk for the agency. Without effective management of critical spare parts, TVA could face equipment failure which could result in safety and generating failures. This review was initiated to determine if the Nuclear Power Group (NPG) and Coal & Gas Operations (C&GO) were effectively managing critical spare parts.We found critical spare parts could be managed more effectively. We found there were inconsistencies in TVA's management of its critical spare parts.

Audit

TVA's Capital Projects Approval Process

Report Number
2012-14789

This review was initiated in follow up to a recent OIG review of TVA's project management software, PowerPlant. During that review, we identified several areas for further analysis related to timely project approvals, delegated approvals, and project charges allocated incorrectly.

Audit

TVA's Nuclear Power Group Preventive Maintenance

Report Number
2012-14845

Preventive maintenance (PM) is important to the reliable operation of assets. As a result of recent issues with nuclear performance, the OIG conducted a review of Nuclear Power Group's (NPG) PM program. The objective of this review was to determine if nuclear plant PM had been performed in accordance with established schedules, and if not, what effect the deviations were having.We found that reported PM metrics may not be accurate. During our review, we identified several concerns that raised questions about the validity of reported PM metrics.

Audit

TVA's Succession Planning

Report Number
2013-14950

The TVA has stated its future depends on effective succession planning and faces a potential workforce challenge due to retirement within the next five years. Also, TVA has identified a risk of senior leadership attrition that could leave a gap in key positions. This review was conducted as a follow-up to a previous OIG review of TVA's succession planning. The objective of this review was to assess TVA's succession planning.This review found TVA has made improvements to succession planning; however, areas for improvement still exist.

Audit

TVA Valley Investment Initiative Program

Report Number
2013-14993

TVA introduced the Valley Investment Initiative (VII) program as a means to incentivize customers to invest in the economic development of its geographic area. The OIG included a review of the VII program in its annual audit plan as the budget for this program has significantly increased since its inception in 2009. Our audit objective was to determine if TVA was exercising adequate oversight over the VII program.

Audit

AMEC Environment and Infrastructure, Inc. (formerly Mactec Engineering and Consulting, Inc.)

Report Number
2012-14561

At the request of the Tennessee Valley Authority's (TVA) Supply Chain and Senior Vice President, Generation Construction, the OIG audited the costs billed to TVA by AMEC Environment and Infrastructure, Inc., (AMEC) for loading coal combustion by-products from the spill at TVA's Kingston Fossil Plant onto rail cars and/or trucks for off-site disposal under an advance authorization agreement (AA) and AMEC's contract with TVA. The audit included $19.3 million in costs billed to TVA from June 2, 2009, through January 13, 2011.

Audit

Oversight of Distributor Compliance

Report Number
2013-14966

The OIG audited the distributor compliance assessments completed through December 31, 2012, to determine if (1) the assessments were adequately planned and performed to verify distributors' compliance with key provisions of the wholesale power contract, (2) the assessments were performed in accordance with the Distributor Compliance Charter and applicable policies, and (3) there was adequate segregation between the group charged with developing, interpreting, and implementing TVA's retail regulatory policy, Retail Regulatory Affairs, and the group responsible for assessing distrib

Audit

Audit of Significant Equipment Failure Risk - Energy Delivery

Report Number
2012-14745

Because of the importance of a reliable transmission system, the OIG audited the risk of significant equipment failure in the Energy Delivery (ED) organization. ED identified four specific actions in its enterprise risk management documentation to mitigate the risk of significant equipment failure. We found the identified mitigation strategy and supporting actions were appropriately designed; however, a lack of funding to the asset preservation program contributed to ED's inability to effectively reduce the risk as planned.

Audit

Contract Compliance Audit - Nol-Tec Systems, Inc

Report Number
2012-14741

The OIG audited $4.8 million in costs billed to the Tennessee Valley Authority (TVA) by Nol-Tec Systems, Inc., to design, furnish, and install hydrated lime injection systems for SO3 mitigation at various TVA fossil plants.

Audit

TVA Board Member Conflict of Interest Allegation Investigated

Report Number
17A-15138

The OIG investigated allegations that TVA Board Chairman William "Bill" Sansom's personal financial interests and position at TVA constituted a conflict of interest and that he had a relative who worked at TVA in violation of TVA's nepotism policy. Federal conflict of interest law prohibits federal officials and employees from acting on a particular matter in their official capacity which affects personal financial interests. There was no evidence Mr.

Audit