Watts Bar Nuclear Vendor Selection Process

Report Number
2025-17529

The Tennessee Valley Authority (TVA) plans to invest approximately $7 billion to extend and preserve the life of its seven nuclear units over the next 20 years. Selection of suppliers responsible for maintenance or system upgrades within TVA’s nuclear fleet can affect TVA’s ability to maintain generation reliability.

Inspection / Evaluation

Contractor Rework - Major Projects

Report Number
2025-17578

To meet the Tennessee Valley region’s growing demand for power, the Tennessee Valley Authority (TVA) is investing in existing assets and new generation.  In fiscal year 2025, TVA invested more than $4.6 billion in capital investments and plans to invest $4.2 billion in fiscal year 2026.  Due to potential risks to cost and schedule from rework in TVA projects, we performed an evaluation of contractor rework for Major Projects at TVA.  The objectives were to evaluate TVA’s oversight of contractor rework and determine if rework was being handled in accordance with con

Inspection / Evaluation

TVA’s Strategic Fiber Program

Report Number
2025-17538

Due to constraints on the existing fiber network, in May 2017, the TVA Board of Directors approved the Strategic Fiber Initiative (SFI) with a budget of $300 million to expand TVA’s fiber capacity by 3,500 miles over the course of ten years on 31 prioritized routes.  In addition, TVA planned to lease surplus fiber to external entities to help offset a portion of the operational costs. As of January 2026, the 31 routes that were originally scheduled for fiber installation had been reduced to 19 routes and mileage reduced from 3,500 to approximately 1,900 miles to stay wi

Inspection / Evaluation

System Access Security – Gas Operations

Report Number
2025-17588

Due to the importance of protecting operational technology from cybersecurity threats, we audited the security of a specific type of system access at the Tennessee Valley Authority’s (TVA) gas sites.  Our objective was to determine if a specific type of system access supporting Gas Operations was securely configured and monitored to mitigate cybersecurity threats.  We made eight recommendations to TVA management.  The specifics are being withheld from public release due to their sensitive nature in relation to TVA’s cybersecurity.

Audit

Contract for Nuclear Steam Supply System Refueling and Inspection Services

Report Number
2025-17573

We performed an audit of costs billed to the Tennessee Valley Authority’s (TVA) by a contractor for nuclear steam supply system refueling and inspection services at TVA’s Watts Bar Nuclear Plant and Sequoyah Nuclear Plant.  The contract provided for TVA to compensate the contractor on a time and material or fixed price basis in accordance with the contract’s pricing schedule.  In addition, the contract provided that (1) outside personnel used for craft labor would be reimbursed at the contractual TVA Project Maintenance and Modification Agreement rates plus an admi

Audit

Risk Mitigation of Low-Pressure Turbines

Report Number
2025-17596

The Tennessee Valley Authority’s (TVA) Enterprise Risk Management (ERM) business unit (BU) focuses on identifying and prioritizing enterprise risks.

Inspection / Evaluation

Renewable Energy Certificates to Meet North Carolina Requirements

Report Number
2025-17598

On October 10, 2023, the North Carolina General Assembly enacted the Clean Energy and Energy Efficiency Portfolio Standard (CEPS) requiring rural electric cooperatives and municipal electric suppliers in North Carolina to meet 10 percent of their energy needs through clean energy resources or energy efficiency measures.  Additionally, North Carolina CEPS requires a percentage of retail sales be attributed to solar, poultry, and swine resources.  The Tennessee Valley Authority’s (TVA) renewable energy certificates (REC) portfolio management process includes obtainin

Inspection / Evaluation

Backup and Recovery of Operational Technology - Gas Operations

Report Number
2025-17557

The Office of the Inspector General performed an audit to determine if the backup and recovery process for operational technology cyber assets at Tennessee Valley Authority (TVA) natural gas plants were (1) designed in accordance with federal guidance and (2) operating as defined by TVA policy.

Audit

Facilities Technology Alliance LLC - Contract No. 15664

Report Number
2025-17567

We performed an audit of costs billed to the Tennessee Valley Authority (TVA) by Facilities Technology Alliance LLC (FTA) under Contract No. 15664 for staff augmentation electrical and telecommunication services.  Our objective was to determine if costs were billed in accordance with the contract’s terms.  Our audit scope included $15.1 million in costs paid to FTA from March 6, 2023, through February 28, 2025.

Audit

Tool Management Controls

Report Number
2025-17560

Between January 1, 2022, and July 8, 2025, TVA spent about $47 million on tools across the fleet.  Due to the amount spent on tools at TVA, we performed an audit of TVA’s tool management controls.  Our audit objective was to determine if controls are in place to safeguard tools at selected sites.  Our audit scope was limited to controls in place at selected sites during our site visits which occurred between May 28, 2025, and June 17, 2025.

Audit