Transmission and Power Supply Arc Flash Protection
The Office of the Inspector General determined some requirements of the Tennessee Valley Authority’s procedures related to arc flash protection and engineering calculations were not performed. Specifically, (1) some arc flash hazard analyses were not performed, (2) arc flash hazard analyses were not periodically reviewed, (3) some arc flash hazard analyses were incomplete or inaccurate, and (4) some hazards were not accurately communicated on warning labels as required. In addition, we found arc flash hazard calculations were not formatted, approved, or maintained as required.