U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Risk Mitigation of Low-Pressure Turbines

Report Information

Date Issued
Report Number
2025-17596
Report Type
Inspection / Evaluation
Description
The Tennessee Valley Authority’s (TVA) Enterprise Risk Management (ERM) business unit (BU) focuses on identifying and prioritizing enterprise risks. Annually, ERM leads the preparation of an enterprise risk portfolio, which includes risks across TVA, to aid leadership in strategic and business planning processes.  Each BU includes their specific risks in the portfolio and documents the probability of occurrence, financial impact, and actions to manage the risk.  TVA Nuclear included Asset/Equipment Failure –  Low-Pressure Turbines risk in fiscal year (FY) 2025 ERM risk portfolio. The risk description stated that one or more low-pressure turbines fail to perform as designed and the details only included Units 2 and 3 at Browns Ferry Nuclear Plant (Browns Ferry).  The actions to address the risk included installing new turbines and steam-path upgrades.  Due to the importance of the reliability of TVA’s nuclear assets, we performed an evaluation of the risk mitigation of low-pressure turbines to determine if TVA was taking planned actions and measuring the impact of completed actions. We determined TVA has taken actions or has plans in place to address the low-pressure turbine risk.  TVA Nuclear has completed 11 of 15 mitigating actions identified for the risk.  The 4 remaining actions are expected to be completed between 2028 and 2030. However, we determined TVA was not effectively measuring the impact of completed actions and a change in the risk scope on the probability of occurrence and financial impact.  In addition, we identified some risk information was not documented accurately.
Joint Report
No
Agency Wide
Yes (agency-wide)
Questioned Costs
$0
Funds for Better Use
$0

Recommendations

We recommend the Vice President, Nuclear Engineering, evaluate probability of occurrence and financial impact to verify they are accurately reported.

We recommend the Vice President, Nuclear Engineering, take steps to ensure that risk information in the Enterprise Risk Management system of record is accurate.